The workflow of the hotel during decoration. I. First, the survey of the decoration company to the decoration location, and the location of important facilities such as pipelines will be marked during the survey. . The second, the second is the designer of the decoration company to formulate a general decoration plan for the hotel. . The technicians of the decoration company began to formulate the direction of pipelines and formulate a detailed pipeline reconstruction plan. . The plan of several previous departments of the moving company began to formulate a total decoration plan. . After the formulation of the plan is completed, the decoration company will interview the rationality of the negotiation decoration plan with customers, and change the plan according to the customer's requirements. 6. Signing the contract to start construction. Extension information: Themores of the hotel decoration 1: Keng to determine the decoration style. Hotel decoration should not be too complicated or alternative. Different home decoration, family decoration can be individual and alternative, but hotel people come and go, not everyone's aesthetics can be the same as themselves. The notice for decoration of the hotel 2: If determined to market positioning. It is not the most luxurious decoration to achieve the best operating benefits. As a service industry, the most important thing is to determine the market. Different population markets need different decoration designs. Then the benefits of operation will definitely not be very good. The notice for decoration of the hotel 3: innovation. The same decoration will certainly have a unique side, and it can only be eliminated slowly in the tens of millions of hotel markets. Therefore, it is necessary to have innovative decoration designs during the decoration to win the victory. Precautions for decoration of hotels: Her visual experience. The reasonable use of colors, lights, shapes, etc. can give customers a good visual experience. Human beings are visual animals, and good -looking decoration can naturally bring good benefits than messy hotels.
In the preparation stage 1, drawing will be trial star hotel decoration is different from ordinary decoration, and must comply with the Star Hotel decoration regulations of the State Tourism Administration; The other is the software. The hardware is that the decoration and equipment installation is directly related to the hotel's future operating costs. The owners, the relevant departments of the hotel management company, the preparations, the relevant personnel, the relevant designer, etc., whether the design drawings are reasonable to lay the hotel's functional layout, whether it meets the requirements of star hotels. Whether it is in line with star -rated hotels in the future, the energy conservation of normal business meets the drainage, whether the pipeline layout is reasonable, whether it is convenient for the measurement of all regions in the future, whether the living pool meets the requirements of star hotels, and is convenient for maintenance. Whether the power transformer is sufficient, whether the power distribution box is enough, whether it is convenient to measure each area in the future, and whether the lamp layout meets the future energy conservation requirements. Weak telephone, whether the network cable function layout is reasonable, and whether the sound control equipment meets the needs of star hotel meetings and banquets. Whether the air conditioning function layout is reasonable, whether the new air volume is reasonable, whether the noise is exceeded, and whether the power of the air conditioner is sufficient. The fire protection function must be determined by local fire review, fire prevention partition, smoke -proof, spraying, and smoke. The functional layout of the kitchen equipment is to determine the area of the kitchen according to the number of meals; whether the amount of air supply and discharge reaches the standard, and whether the noise of smoke is exceeded. 2, bidding for sub -systems or types of work The system is: outer wall, water, electricity, weak electricity, fire, heating, elevator, decoration, kitchen equipment, conference equipment and other procurement. 3. Go through the relevant construction license procedures The facade renderings are sent to the Urban Construction Planning Bureau for approval In internal decoration drawings will be sent to fire approval, and decoration construction is implemented in accordance with the fire review opinions. This, boiler, kitchen smoke, and drainage drawings are approved by the Environmental Protection Bureau The local construction bureau to apply for decoration construction permits This to apply for zero -time electricity and water use procedures related to construction site. The decoration execution phase . Material entry acceptance: 1. Strictly control the quality of the acceptance of the cover materials, the main material should be available for the supply unit or the processing unit of the processing unit, , and there are qualified certificates and manuals. It must meet the requirements of fire protection and environmental protection. 2. Check whether all materials are the same as signing the contract. 3, accept the thickness of the woodwood board, whether the flatness meets the requirements and fill in the acceptance records 4, the thickness of the acceptance panel, whether the color difference meets the requirements and fill in the acceptance records 5, whether the thickness of the plaster board meets the requirements and the requirements of the plaster board meet the requirements and the requirements of the plaster board meet the requirements. Fill in the acceptance records 6, whether the cement meets the design requirements and fills in the acceptance records 7, whether the color difference of the inspection wall sheet meets the requirements and fill in the acceptance records 8, whether the marble color difference meets the requirements and fill in the acceptance record r 9. Select whether all ceiling materials meet the design or contract requirements and fill in the acceptance records 10, whether all pipelines meet the design or contract requirements and fill in the acceptance records 11, whether all wires meet the design or contract requirements and the contract requirements Fill in the acceptance records 12, accept whether all hardware sanitary wares meet the design or contract requirements and fill in the acceptance records 13, whether all the equipment meets the design or contract requirements and fill in the acceptance records 14, whether all the furniture is in line with Design or contract requirements and fill in the acceptance records 15, whether all electrical appliances meet the design or contract requirements and fill in the acceptance records. Supplementary materials acceptance table: . On -site management: 1, together with the project in the project (outer wall, water, electricity, fire protection, HVAC, decoration), formulate the construction project schedule. 2. Signed the following responsible letter with the relevant construction team leaders and archive the materials of the materials, a, the power responsibility for power consumption of construction site, B, construction site fire safety responsibility letter, C, construction site civilization construction responsibility Books, D. Personal safety responsibility letter of construction staff. 3. The construction team coordination meeting is held every day to coordinate the problems between the construction teams in a timely manner, so as to solve problems in time, and require the construction site to be cleared every day. 4. The company's safety managers, on duty at 24 hours, regularly inspecting the construction site, found that the construction team was stopped in time, registered and filled with the construction site construction personnel and issued a certificate in and out of the exit. Safety managers must check all the items brought by them with them. For the take -out tools, Party A must be signed and approved by the construction staff of Party A. 5. Check the progress of the construction schedule of the construction schedule of the construction site every day; 6, inspect each construction team every day to check whether the construction meets national norms, and does not regulate the place to rectify the construction team for rectification; r r 7. When the on -site construction does not match the drawings, the design unit is adjusted in time according to the situation or contact the design unit to avoid affecting the construction period. 8. According to the national construction specifications, the daily inspection of the construction site The ceiling project check whether the boom is 11m distance, whether the main dragon is 11m distance, the distance of the second dragon 4545cm, the distance of the gypsum plate seam 0.3-05cm distance, the gypsum board fixed The distance between the screw and the half distance is 10-15cm, and the distance between 15-20cm between the screws is done. This wooden decorative shape inspection, the wood must be dry, without cracks, and non -corrosion; the interface and connection are fixed firmness, whether The flatness, the yin angle, and the vertical degree of the yang corner are done with the corresponding record archive The wall surface of the wall of the wall, the wood must be dry, without cracks, and no corrosion; N grassroots fire treatment, moisture -proof treatment at the grassroots level, decorative panel seams, color differences, whether the pattern is aligned, flat, yin, yang, yang horns vertical archive painted paint check, whether the construction process surface first first first Make -up ash, moderate thickness, repeatedly polish after drying until it is smooth and flat, no defects, no cracks, whether the color difference, bubbles, and hanging beads; the surface smoothness, and the corresponding record archive Inspection, the wall inspection is moisture -proof, tiles or marble light plate surfaces should be smooth, the polishing should meet the requirements, the texture arrangement must be unified, the incision must be straight, the plane cannot be cracking, the thickness must be the same; Whether it is empty, the seam to u003C2mm, the seam height is u003C0.3mm, the width of the seam is u003C0.5mm, the color difference, whether the pattern is aligned, the flatness, the yin angle, the vertical of the corner of the yang, the corresponding record file Wall flour decoration project inspection, wall flour decoration flatness, yin corner, yang horns vertical degree archive This on the bottom of the wallpaper, roll over the bottom layer of the wall, do not leak, wallpaper seams are flat, pattern patterns, lines are coherent and coherent Essence The flatness of the ground inspection, the strong level of the grassroots, the tile or marble light plate surface should be smooth, the polishing should meet the requirements, the texture arrangement must be unified, the incision must be straight, the plane cannot be crack, the thickness must Basically consistent; whether the paste is empty, the seam to u003C2mm, the seam height is u003C0.3mm, the width of the seam is u003C0.5mm, the color difference, whether the pattern is aligned, the flatness, the yin angle, the vertical of the yang corner, the corresponding record can be done well Archives The door and window installation should be corrected horizontally and vertical. The wooden frame must be solid. The door frame should be treated with moisture -proof treatment. The upper and lower size must be consistent. Check whether the opening is flexible, whether the height, size, and position meet the design requirements The lamp inspection of the wire construction process meets the requirements, whether the grounding, zero, and lightning protection are reliable, whether the lighting meets the hotel operation requirements, whether it is in the same branch line in the same branch line Do the corresponding record archive The hardware electrical appliances check whether the installation location is correct, whether the fixation is firm, whether the use is convenient, whether the number is complete, and make the corresponding record archive. Is whether the upper and lower water pipeline brackets are fixed and firm, whether the drainage pipes have slopes, there must be no stagnant water, whether the rain, dirt, waste, and breathable pipeline can be separated, whether the drainage is smooth, whether the pressure is in line with the work pressure of 1.5 times, and keep the pressure pressure Whether the pressure of 24 hours meets the standard. Whether the maintenance is convenient and do the corresponding record archives. V check -out air supply, whether the smoking system work is normal, whether the design requirements meet, whether the air duct construction process meets the requirements, whether the noise meets the requirements, whether the leakage rate meets the requirements and make the corresponding record archive Check the air conditioner to check the air conditioner Whether the system work is normal, whether it meets the design requirements, whether the air duct construction process meets the requirements, whether the noise meets the requirements, whether the leakage rate meets the requirements and do the corresponding record archive to check the fire system, whether the spray work is normal, whether the alarm alarms Normal, whether the fire hydrant work is normal 1. The materials in the construction require both parties to confirm that the person in charge of the two parties must be signed and recognized, and the official seal of the two parties must be stamped. 2. Statistically count the number of purchases of items in the corresponding supporting equipment (sanitary cleansing, hardware home appliances, carpets, intensification, lamps, etc.). 3. Timely track and debug the facilities and equipment, check whether the facilities and equipment meet the contract indication equipment, make corresponding debugging reports and archive. 4. According to the reasonable requirements of the hotel business department, corresponding rectification is made. . Acceptance 1. Assisting fire protection for acceptance and acceptance. In the acceptance, the list does not meet the requirements, list the list, and immediately rectify the relevant decoration units or teams The report is until the report. 2. Assisting public security for monitoring and acceptance. In the acceptance, it does not meet the requirements of the requirements. The list will be rectified immediately by the relevant decoration units or classes until the relevant departments will issue a written report for passing the acceptance. 3. Assist in conducting special equipment elevators for quality inspection stations and acceptance of boilers. In the acceptance, the list does not meet the requirements. List the list by until. 4. Assisting the health and epidemic prevention station for the kitchen acceptance. In the acceptance, it does not meet the requirements of the requirements. List the list to immediately rectify the relevant decoration list , and the team will be rectified immediately until the relevant departments issue a written report for qualified acceptance. 5. Assisting the Environmental Protection Bureau for environmental protection facilities and acceptance. In the acceptance, it does not meet the requirements of the requirements. The list will be rectified immediately by the relevant decoration list or the team until the relevant departments will issue a written report of the acceptance of acceptance. 6, the person in charge of the relevant items (water, electricity, weak electricity, fire protection, equipment, decoration, etc.), supervision of relevant personnel, winning the bid for construction -unit relevant personnel, hotel management personnel together Acceptance (including facilities and equipment). Fill in the decoration acceptance report; the list does not meet the requirements in the acceptance and lists the list. Immediate rectification will be rectified by relevant decoration units or teams. Until it meets the requirements of relevant star hotels and issue an experience acceptance report. It data arrangement and transfer 1. Collect various archive materials, collect the corresponding facilities and equipment qualification certificates, use instructions, warranty cards, and after the decoration is completed to the hotel operator 2,,, The Ministry of Business Management Finance is transferred to all fixed asset lists, legal documents, and contract texts. 3. The Ministry of Human Resources of the Hotel was transferred to the hotel's key to lock the key. 4. Transfer related facilities and equipment related to the hotel -related use department. 5. The telephone number of the person in charge of the construction team is listed, and the related facility and equipment manufacturer's warranty contact telephone number is transferred to the hotel project for future warranty contact. 6. Export the relevant completion information with the relevant departments of the hotel. 7. The complete work preparatory personnel withdrew, and the decoration was over. Chongqing is still decorated, hotel decoration design expert
First, formulate a construction plan; second, select the construction team; finally, the construction is carried out in accordance with the scheduled plan.
The hotel managers can accept the results after construction. When accepting the acceptance, you must carefully check each detail. If you find any errors or vulnerabilities, you must respond to the decoration engineering team in time to fill the loopholes in a timely manner.
The company with good reputation can be more assured to decorate. These aspects are better. It is still a Fengya decoration company. Construction and material design construction double B professional decoration company. The company has been engaged in hotels and hotels for many years, with innovative design and reasonable offer, and a group of independent professional construction teams to ensure construction green environmental protection and safety and civilization.
In more questions, please consult Fengya decorative customer service!
Nowadays, in addition to home improvement, there are some other places decoration that gradually appear in people's vision. Among them, there are factory decoration, pharmaceutical factory decoration and hotel decoration. In comparison of these places, hotels, hotels, hotels, hotels, hotels, hotels, hotels, hotels, hotels, hotels, hotels, hotels, hotels, hotels, hotels. The most special decoration is because the hotel decoration involves the kitchen and guest rooms, so the details contained in the decoration and the details to be noticed during the decoration are far from the decoration of several other places. One said, the hotel's workflow during decoration. First of all, let's tell you about the process of decoration of Nanchang Hotel: . First, the survey of the decoration company to the decoration location, and the position of important facilities such as the pipeline during the survey. . The second is the designer of the decoration company to formulate a general decoration plan for the hotel. . The technicians of the decoration company began to formulate the direction of pipelines and formulate a detailed pipeline reconstruction plan. . The plan of several previous departments of the moving company began to formulate a total decoration plan. . After the formulation of the plan is completed, the decoration company will interview the rationality of the negotiation decoration plan with customers, and change the plan according to the customer's requirements. 6. Signing the contract to start construction.
The hotel and hotel decoration should be done well. It is necessary to design the project, construction company, decoration company, and hotel furniture, soft and accessories and other aspects. Special hotel furniture needs to find professional manufacturers to customize.
The workflow of the hotel during decoration.
I. First, the survey of the decoration company to the decoration location, and the location of important facilities such as pipelines will be marked during the survey.
. The second, the second is the designer of the decoration company to formulate a general decoration plan for the hotel.
. The technicians of the decoration company began to formulate the direction of pipelines and formulate a detailed pipeline reconstruction plan.
. The plan of several previous departments of the moving company began to formulate a total decoration plan.
. After the formulation of the plan is completed, the decoration company will interview the rationality of the negotiation decoration plan with customers, and change the plan according to the customer's requirements.
6. Signing the contract to start construction.
Extension information:
Themores of the hotel decoration 1:
Keng to determine the decoration style. Hotel decoration should not be too complicated or alternative. Different home decoration, family decoration can be individual and alternative, but hotel people come and go, not everyone's aesthetics can be the same as themselves.
The notice for decoration of the hotel 2:
If determined to market positioning. It is not the most luxurious decoration to achieve the best operating benefits. As a service industry, the most important thing is to determine the market. Different population markets need different decoration designs. Then the benefits of operation will definitely not be very good.
The notice for decoration of the hotel 3:
innovation. The same decoration will certainly have a unique side, and it can only be eliminated slowly in the tens of millions of hotel markets. Therefore, it is necessary to have innovative decoration designs during the decoration to win the victory.
Precautions for decoration of hotels:
Her visual experience. The reasonable use of colors, lights, shapes, etc. can give customers a good visual experience. Human beings are visual animals, and good -looking decoration can naturally bring good benefits than messy hotels.
In the preparation stage
1, drawing will be trial
star hotel decoration is different from ordinary decoration, and must comply with the Star Hotel decoration regulations of the State Tourism Administration; The other is the software. The hardware is that the decoration and equipment installation is directly related to the hotel's future operating costs. The owners, the relevant departments of the hotel management company, the preparations, the relevant personnel, the relevant designer, etc., whether the design drawings are reasonable to lay the hotel's functional layout, whether it meets the requirements of star hotels. Whether it is in line with star -rated hotels in the future, the energy conservation of normal business meets the drainage, whether the pipeline layout is reasonable, whether it is convenient for the measurement of all regions in the future, whether the living pool meets the requirements of star hotels, and is convenient for maintenance. Whether the power transformer is sufficient, whether the power distribution box is enough, whether it is convenient to measure each area in the future, and whether the lamp layout meets the future energy conservation requirements. Weak telephone, whether the network cable function layout is reasonable, and whether the sound control equipment meets the needs of star hotel meetings and banquets. Whether the air conditioning function layout is reasonable, whether the new air volume is reasonable, whether the noise is exceeded, and whether the power of the air conditioner is sufficient. The fire protection function must be determined by local fire review, fire prevention partition, smoke -proof, spraying, and smoke. The functional layout of the kitchen equipment is to determine the area of the kitchen according to the number of meals; whether the amount of air supply and discharge reaches the standard, and whether the noise of smoke is exceeded.
2, bidding for sub -systems or types of work
The system is: outer wall, water, electricity, weak electricity, fire, heating, elevator, decoration, kitchen equipment, conference equipment and other procurement.
3. Go through the relevant construction license procedures
The facade renderings are sent to the Urban Construction Planning Bureau for approval
In internal decoration drawings will be sent to fire approval, and decoration construction is implemented in accordance with the fire review opinions.
This, boiler, kitchen smoke, and drainage drawings are approved by the Environmental Protection Bureau
The local construction bureau to apply for decoration construction permits
This to apply for zero -time electricity and water use procedures related to construction site.
The decoration execution phase
. Material entry acceptance:
1. Strictly control the quality of the acceptance of the cover materials, the main material should be available for the supply unit or the processing unit of the processing unit,
,
and there are qualified certificates and manuals. It must meet the requirements of fire protection and environmental protection.
2. Check whether all materials are the same as signing the contract.
3, accept the thickness of the woodwood board, whether the flatness meets the requirements and fill in the acceptance records
4, the thickness of the acceptance panel, whether the color difference meets the requirements and fill in the acceptance records
5, whether the thickness of the plaster board meets the requirements and the requirements of the plaster board meet the requirements and the requirements of the plaster board meet the requirements. Fill in the acceptance records
6, whether the cement meets the design requirements and fills in the acceptance records
7, whether the color difference of the inspection wall sheet meets the requirements and fill in the acceptance records
8, whether the marble color difference meets the requirements and fill in the acceptance record r
9. Select whether all ceiling materials meet the design or contract requirements and fill in the acceptance records
10, whether all pipelines meet the design or contract requirements and fill in the acceptance records
11, whether all wires meet the design or contract requirements and the contract requirements Fill in the acceptance records
12, accept whether all hardware sanitary wares meet the design or contract requirements and fill in the acceptance records
13, whether all the equipment meets the design or contract requirements and fill in the acceptance records
14, whether all the furniture is in line with Design or contract requirements and fill in the acceptance records
15, whether all electrical appliances meet the design or contract requirements and fill in the acceptance records. Supplementary materials acceptance table:
. On -site management:
1, together with the project in the project (outer wall, water, electricity, fire protection, HVAC, decoration), formulate the construction project schedule.
2. Signed the following responsible letter with the relevant construction team leaders and archive the materials of the materials,
a, the power responsibility for power consumption of construction site, B, construction site fire safety responsibility letter, C, construction site civilization construction responsibility Books, D. Personal safety responsibility letter of construction staff.
3. The construction team coordination meeting is held every day to coordinate the problems between the construction teams in a timely manner, so as to solve problems in time, and require the construction site to be cleared every day.
4. The company's safety managers, on duty at 24 hours, regularly inspecting the construction site, found that the construction team was stopped in time, registered and filled with the construction site construction personnel and issued a certificate in and out of the exit. Safety managers must check all the items brought by them with them. For the take -out tools, Party A must be signed and approved by the construction staff of Party A.
5. Check the progress of the construction schedule of the construction schedule of the construction site every day;
6, inspect each construction team every day to check whether the construction meets national norms, and does not regulate the place to rectify the construction team for rectification; r r
7. When the on -site construction does not match the drawings, the design unit is adjusted in time according to the situation or contact the design unit to avoid affecting the construction period.
8. According to the national construction specifications, the daily inspection of the construction site
The ceiling project check whether the boom is 11m distance, whether the main dragon is 11m distance, the distance of the second dragon 4545cm, the distance of the gypsum plate seam 0.3-05cm distance, the gypsum board fixed The distance between the screw and the half distance is 10-15cm, and the distance between 15-20cm between the screws is done.
This wooden decorative shape inspection, the wood must be dry, without cracks, and non -corrosion; the interface and connection are fixed firmness, whether
The flatness, the yin angle, and the vertical degree of the yang corner are done with the corresponding record archive
The wall surface of the wall of the wall, the wood must be dry, without cracks, and no corrosion; N grassroots fire treatment, moisture -proof treatment at the grassroots level, decorative panel seams, color differences, whether the pattern is aligned, flat, yin, yang, yang horns vertical archive
painted paint check, whether the construction process surface first first first Make -up ash, moderate thickness, repeatedly polish after drying until it is smooth and flat, no defects, no cracks, whether the color difference, bubbles, and hanging beads; the surface smoothness, and the corresponding record archive
Inspection, the wall inspection is moisture -proof, tiles or marble light plate surfaces should be smooth, the polishing should meet the requirements, the texture arrangement must be unified, the incision must be straight, the plane cannot be cracking, the thickness must be the same; Whether it is empty, the seam to u003C2mm, the seam height is u003C0.3mm, the width of the seam is u003C0.5mm, the color difference, whether the pattern is aligned, the flatness, the yin angle, the vertical of the corner of the yang, the corresponding record file
Wall flour decoration project inspection, wall flour decoration flatness, yin corner, yang horns vertical degree archive
This on the bottom of the wallpaper, roll over the bottom layer of the wall, do not leak, wallpaper seams are flat, pattern patterns, lines are coherent and coherent Essence
The flatness of the ground inspection, the strong level of the grassroots, the tile or marble light plate surface should be smooth, the polishing should meet the requirements, the texture arrangement must be unified, the incision must be straight, the plane cannot be crack, the thickness must Basically consistent; whether the paste is empty, the seam to u003C2mm, the seam height is u003C0.3mm, the width of the seam is u003C0.5mm, the color difference, whether the pattern is aligned, the flatness, the yin angle, the vertical of the yang corner, the corresponding record can be done well Archives
The door and window installation should be corrected horizontally and vertical. The wooden frame must be solid. The door frame should be treated with moisture -proof treatment. The upper and lower size must be consistent. Check whether the opening is flexible, whether the height, size, and position meet the design requirements
The lamp inspection of the wire construction process meets the requirements, whether the grounding, zero, and lightning protection are reliable, whether the lighting meets the hotel operation requirements, whether it is in the same branch line in the same branch line Do the corresponding record archive
The hardware electrical appliances check whether the installation location is correct, whether the fixation is firm, whether the use is convenient, whether the number is complete, and make the corresponding record archive.
Is whether the upper and lower water pipeline brackets are fixed and firm, whether the drainage pipes have slopes, there must be no stagnant water, whether the rain, dirt, waste, and breathable pipeline can be separated, whether the drainage is smooth, whether the pressure is in line with the work pressure of 1.5 times, and keep the pressure pressure Whether the pressure of 24 hours meets the standard. Whether the maintenance is convenient and do the corresponding record archives.
V check -out air supply, whether the smoking system work is normal, whether the design requirements meet, whether the air duct construction process meets the requirements, whether the noise meets the requirements, whether the leakage rate meets the requirements and make the corresponding record archive
Check the air conditioner to check the air conditioner Whether the system work is normal, whether it meets the design requirements, whether the air duct construction process meets the requirements, whether the noise meets the requirements, whether the leakage rate meets the requirements and do the corresponding record archive
to check the fire system, whether the spray work is normal, whether the alarm alarms Normal, whether the fire hydrant work is normal
1. The materials in the construction require both parties to confirm that the person in charge of the two parties must be signed and recognized, and the official seal of the two parties must be stamped.
2. Statistically count the number of purchases of items in the corresponding supporting equipment (sanitary cleansing, hardware home appliances, carpets, intensification, lamps, etc.).
3. Timely track and debug the facilities and equipment, check whether the facilities and equipment meet the contract indication equipment, make corresponding debugging reports and archive.
4. According to the reasonable requirements of the hotel business department, corresponding rectification is made.
. Acceptance
1. Assisting fire protection for acceptance and acceptance. In the acceptance, the list does not meet the requirements, list the list, and immediately rectify the relevant decoration units or teams The report is until the report.
2. Assisting public security for monitoring and acceptance. In the acceptance, it does not meet the requirements of the requirements. The list will be rectified immediately by the relevant decoration units or classes
until the relevant departments will issue a written report for passing the acceptance.
3. Assist in conducting special equipment elevators for quality inspection stations and acceptance of boilers. In the acceptance, the list does not meet the requirements. List the list by
until.
4. Assisting the health and epidemic prevention station for the kitchen acceptance. In the acceptance, it does not meet the requirements of the requirements. List the list to immediately rectify the relevant decoration list
, and the team will be rectified immediately until the relevant departments issue a written report for qualified acceptance.
5. Assisting the Environmental Protection Bureau for environmental protection facilities and acceptance. In the acceptance, it does not meet the requirements of the requirements. The list will be rectified immediately by the relevant decoration list
or the team until the relevant departments will issue a written report of the acceptance of acceptance.
6, the person in charge of the relevant items (water, electricity, weak electricity, fire protection, equipment, decoration, etc.), supervision of relevant personnel, winning the bid for construction
-unit relevant personnel, hotel management personnel together Acceptance (including facilities and equipment). Fill in the decoration acceptance report; the list does not meet the requirements in the acceptance and lists the list. Immediate rectification will be rectified by relevant decoration units or teams. Until it meets the requirements of relevant star hotels and issue an experience acceptance report.
It data arrangement and transfer
1. Collect various archive materials, collect the corresponding facilities and equipment qualification certificates, use instructions, warranty cards, and after the decoration is completed
to the hotel operator
2,,, The Ministry of Business Management Finance is transferred to all fixed asset lists, legal documents, and contract texts.
3. The Ministry of Human Resources of the Hotel was transferred to the hotel's key to lock the key.
4. Transfer related facilities and equipment related to the hotel -related use department.
5. The telephone number of the person in charge of the construction team is listed, and the related facility and equipment manufacturer's warranty contact telephone number is transferred to the hotel project for future warranty contact.
6. Export the relevant completion information with the relevant departments of the hotel.
7.
The complete work preparatory personnel withdrew, and the decoration was over.
Chongqing is still decorated, hotel decoration design expert
First, formulate a construction plan; second, select the construction team; finally, the construction is carried out in accordance with the scheduled plan.
The hotel managers can accept the results after construction. When accepting the acceptance, you must carefully check each detail. If you find any errors or vulnerabilities, you must respond to the decoration engineering team in time to fill the loopholes in a timely manner.
The company with good reputation can be more assured to decorate. These aspects are better. It is still a Fengya decoration company. Construction and material design construction double B professional decoration company. The company has been engaged in hotels and hotels for many years, with innovative design and reasonable offer, and a group of independent professional construction teams to ensure construction green environmental protection and safety and civilization.
In more questions, please consult Fengya decorative customer service!
Nowadays, in addition to home improvement, there are some other places decoration that gradually appear in people's vision. Among them, there are factory decoration, pharmaceutical factory decoration and hotel decoration. In comparison of these places, hotels, hotels, hotels, hotels, hotels, hotels, hotels, hotels, hotels, hotels, hotels, hotels, hotels, hotels, hotels. The most special decoration is because the hotel decoration involves the kitchen and guest rooms, so the details contained in the decoration and the details to be noticed during the decoration are far from the decoration of several other places. One said, the hotel's workflow during decoration.
First of all, let's tell you about the process of decoration of Nanchang Hotel:
. First, the survey of the decoration company to the decoration location, and the position of important facilities such as the pipeline during the survey.
. The second is the designer of the decoration company to formulate a general decoration plan for the hotel.
. The technicians of the decoration company began to formulate the direction of pipelines and formulate a detailed pipeline reconstruction plan.
. The plan of several previous departments of the moving company began to formulate a total decoration plan.
. After the formulation of the plan is completed, the decoration company will interview the rationality of the negotiation decoration plan with customers, and change the plan according to the customer's requirements.
6. Signing the contract to start construction.
The hotel and hotel decoration should be done well. It is necessary to design the project, construction company, decoration company, and hotel furniture, soft and accessories and other aspects. Special hotel furniture needs to find professional manufacturers to customize.